KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  2-23-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Started fuel vent lines

Started the fuel tank vent lines:

* studied plans; DWG 36A badly displays the placement of bends for the lines behind (or in front?) of the landing gear weldment. Also the hole for the right-angle bulkhead fitting for the vent line does not seem to be where the plans indicate.

* drilled the 3/4" and 1" holes on each side for vent and fuel lines to wing tanks, inserted grommets.

* bent the first vent lines between fuse/wing opening and fitting on vertical member, both sides
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.