KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  4-15-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Canopy cabin frame

Measured the fuselage width, laid out the canopy cabin frame on the work table and sanded off excess material from both ends of each aft half. Match-drilled frame to F-631E plate. Clamped inner strap F-631B in preparation for riveting.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.