KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  11-2-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Continued installation of static line

Made tabs to secure static line if aft fuselage, going forward from static ports. Drilled out two existing flush rivets and re-riveted with tabs in place (Image 1). Goes to a tee adjacent to the ADAHRS tray, where one line will terminate in the ADAHRS, the other line continues run forward. Drilled hole in beefy F-705 bulkhead to accept static line for run forward along longeron.
' style=

Secured static line in aft fuse

Secured static line in aft fuse

' style=

Connects to tee to fwd fuse and ADAHRS

Connects to tee to fwd fuse and ADAHRS

' style=

Drilled 1/4

Drilled 1/4" ID hole in F-705 bulkhead to pass static line fwd

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.