KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  5-1-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Finished torqueing plumbing fittings; bolted left

Finished tightening existing brake and fuel line fittings. Still need to do connection to fuel pump/filter and then forward to firewall.

Tightened bolts for left landing gear mount. Need to study plans to see exactly how the wing spar fits and which bolts are used for that.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.