KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  6-28-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Drilled out bad rivets and re-riveted.

Ed Martinson, Sac RVators president and EAA Tech Counselor, came by to help with my riveting of the aileron attach brackets. I drilled out some bad ones and we redid 3. Another 3 require 5/32 rivets which I ordered from ACS. Thanks Ed!

Riveted the left wing aileron gap fairing with the squeezer.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.