KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  5-30-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Started flap gap fairing
' style=

Pitot & AOA lines; landing light, strobe, nav, VOR wires

Pitot & AOA lines; landing light, strobe, nav, VOR wires

' style=

Drilling out the match holes for flap gap fairing

Drilling out the match holes for flap gap fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.