KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  12-10-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Began conduit install

Began installing the conduit (1/2" PVC irrigation pipe, Sched 200 I think). Using TerminalTown's CTM-HM mount (http://www.terminaltown.com/Pages/Page65.html). But first I had to get a heater--got a cheapo propane tank-top heater from Ace Hardware and Aviation Supply, takes the chill off the garage air.
' style=

Temporary clamp to align

Temporary clamp to align

' style=

A final install, though plastic tie will be replaced with aircraft quality

A final install, though plastic tie will be replaced with aircraft quality

' style=

Mostly done.

Mostly done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.