KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  11-26-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Removed and replaced heater control box

Removed the aluminum heater control box and replaced it with a steel unit. Resealed with high-temperature RTV.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.