Powered By Kitlog Pro v2.0
LARRY'S WEB SITE
CH-750
Wings
10-11-2015
< Previous Log Entry
Next Log Entry >
Date:
10-11-2015
Number of Hours:
3.50
Manual Reference:
75-WA-1
Brief Description:
Left Wing Skeleton
Worked on Left Pilots wing. Located and mounted all nose ribs and wing ribs.
Drilled out and deburred all nose ribs and wing ribs to A5.
Also drilled out and deburred all right nose ribs and wing ribs in prep for right wing.
Located the tie down rign. Drilled out to A5 and set aside.
Located the I/B rear channel, O/B rear channel, rear upper strut fitting, and rear channel doubler . Clecoed and drilled out to A5.
Located rear root doubler. Installed and drilled out to A5.
Mounted the rear channel to end of wing ribs. Drilled out to A5.
Located and cleco the root wing rib.
Left Wing
Left Wing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-750 Home
Category
# Logs
# Hours
All
69
126
Horizontal Elevator
12
26
Horizontal Stab
10
18
Miscellaneous
5
12
Wings
42
70
Copyright © 2001-2024 Matronics. All Rights Reserved.