Powered By Kitlog Pro v2.0
Richards Web Site
RV 7
Empennage
10-7-2014
< Previous Log Entry
Next Log Entry >
Date:
10-7-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Vertical stabilizer install
Rechecked the measurements then drilled the bolt holes through the F712 elevator stop. Aligned the vertical stab per the instructions and drilled the front spar to the F781. Then drilled the bottom of the rear spar to the F712 bulkhead.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 7 Home
Category
# Logs
# Hours
All
284
855
Avionics
2
1
Empennage
46
106
Finish Kit
8
15
Fuselage
107
403
Miscellaneous
1
4
None
3
Shop Supplies
1
1
Tools
1
Wings
115
325
Copyright © 2001-2024 Matronics. All Rights Reserved.