Clamped the vertical stabilizer to the back of the F712 bulkhead. Set the height and took measurements from the tip of the vertical stab to the tips of the horizontal stab. Adjusted until both measurements were equal.
Installed the Dynon pitch servo using the Dynon installation kit. Torqued all hardware and saftied per instructions.