Cut ELT control cable to size and installed connector. Tested ELT. Drilled two 3/8 holes in belly for brakeline bulkhead fittings. Installed fittings and attacher brakelines. Brakes are now complete from master cylinder to brakes. Rerouted and secured fuel pump and fuel flow wires. Drilled and clecoed the left and right NACA ducts. Spent a couple of hours evaluating where I stand and what to do next and the order to do it in.