Match drilled the A-909 counterbalance tubes. A curved file attached to a dowel rod worked well in deburring the inside of the tube.
Match drilled the A-1206 Pivot brackets and A-1207 Actuator brackets. Used a drill press with various balancing points to guarantee perpendicular drilling. Deburred all holes.