KitLog pro

Powered By Kitlog Pro v2.0

RAFAEL'S WEB SITE
' style=
Date:  7-21-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Instrument panel, tunnel

Installed forward floor and tunnel cover plates.

Re-installed F-1240 instrument top panel.

Secured instrument panel with screws.

Installed label inside lower cowl.

Cut regulator blast tube and installe it with RTV.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.