KitLog pro

Powered By Kitlog Pro v2.0

RAFAEL'S WEB SITE
' style=
Date:  7-20-2012
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Oil System

Installed oil hoses.

Installed gasket on radiator interface. Applied RTV and let it sit to cure.

Fabricated F-00002 voltage regulator schroud and rivetted on regulator. Drilled 3/4" hole on cooling shroud. Ready to install blast tube.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.