KitLog pro

Powered By Kitlog Pro v2.0

Phills Web Site
' style=
Date:  4-21-2019
Number of Hours:  36.00
Manual Reference:  
Brief Description:  fuel injection system is pressurized

Forward: fabricate and install permanent panel segment for Appareo Stratus ESG ADS-B. Mount and wire the 2i ADS-B IN module and the encoding altimeter. Waiting on D-Sub parts. Waiting on Aircraft Spruce order to finish the GPS antenna connection. Ready to re-wire the Grand Rapids EIS.
Fuel main-sender and low-level float sender wires routed to panel. Ready to calibrate the capacitive probe.
Pulled and labeled all engine temp wiring to panel.
Installed galvanized steel vertical firewall.
Save here before truncation.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.