Powered By Kitlog Pro v2.0
Steves RV-7 Web Site
RV-7
All
8-24-2015
< Previous Log Entry
Next Log Entry >
Date:
8-24-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
Match Drilling Vertical Stabilizer
Tonight I cleco'ed the vertical stabilizer spars, ribs and brackets together and match drilled the holes.
Then the skin is cleco'ed on and match drilled.
Ribs and spars match drilled
Skin ready to match drill
Match drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
56
164
Empennage
2
2
Horizontal Stabilize
31
94
Practice Kits
2
6
Shop Supplies
7
14
Tools
6
10
Vertical Stabilizer
7
38
Wings
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.