Powered By Kitlog Pro v2.0
CAF Carl's Aircraft Factory
RV-8
All
3-22-2006
< Previous Log Entry
Next Log Entry >
Date:
3-22-2006
Number of Hours:
1.10
Manual Reference:
Brief Description:
Match drilled VS skin and disassembled
Matched drilled the VS skin and then removed the plastic overlay along the rivet lines. Disassembled the VS and removed all the plastic from the spars.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
64
69
Empennage
45
51
Miscellaneous
3
2
Tools
7
5
Training Kit
9
11
Copyright © 2001-2024 Matronics. All Rights Reserved.