Powered By Kitlog Pro v2.0
CAF Carl's Aircraft Factory
RV-8
All
3-21-2006
< Previous Log Entry
Next Log Entry >
Date:
3-21-2006
Number of Hours:
1.00
Manual Reference:
Brief Description:
Prepped ribs and match drilled spars
Prepared the ribs then clecoed to the spars. Matched drilled all the holes in the skeleton. Clecoed on the skin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
64
69
Empennage
45
51
Miscellaneous
3
2
Tools
7
5
Training Kit
9
11
Copyright © 2001-2024 Matronics. All Rights Reserved.