KitLog pro

Powered By Kitlog Pro v2.0

RV-8 N998W
' style=
Date:  12-17-1999
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Tech inspection

Phil Arter did a Tech Inspection on my wings. The following was noted: 1 - Lubricate aileron bellcranks 2 - Debur fuel tank spar holes 3 - Rivet main rib flange to main rib (1) LH wing before installing end ribs. 4 - Don't over tighten wing tank screws 5 - Aileron, inboard bracket, middle bolt. File and fit washer to fit flange 6 - Fit washers under heads and bolts for 2 threads showing for all assemblies.
' style=

Constructed wing jig storage dolly.

Constructed wing jig storage dolly.

' style=

Secured spar to dolly.

Secured spar to dolly.

' style=

Transported wing dolly to hangar.

Transported wing dolly to hangar.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.