KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  5-14-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Main gear and fuel lines

Checked the toe-in/out on the main landing gear. The left main wheel had a bit more toe-out than I liked. Removed the axle and shimmed it. This corrected the issue. Packed the wheel bearings and set the pre-load. Although it seems too tight, it is set according to Matco instructions.

Worked on fitting the fuel lines from the tanks to the fuel valve. I am running them through the fuselage forward side panels in the same hole as the aileron push rods go through. Had to reshape and enlarge the holes but I think it is going to work good.
' style=

Reshaped holes in the forward side panel

Reshaped holes in the forward side panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.