KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  6-10-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Baggage Compartment Floor

Started work on the baggage floor. Everything went pretty smoothly. I cut the openings a bit big for the channel that goes up from the rear spar bulkhead, but nothing a little carpet will not cover up in the end. Oddly, when I looked over Charles' quick built, there is no cut-out since they stop the upright below the baggage floor.
' style=

L angle drilled to the sides.  Supports floor

L angle drilled to the sides. Supports floor

' style=

View of where the L attacheds to the upper seat back

View of where the L attacheds to the upper seat back

' style=

Baggage floor with L angle drilled and cut-outs made

Baggage floor with L angle drilled and cut-outs made

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.