KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  5-12-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilled bottom of side skins for and aft of the ge

I went back to the workshop tonight and drilled the skins to the bottom longeron between the gear channel and the rear joint of the front fuse side.

I also installed the angle bracket between the front spar and the gear channel. I had to drill out 4 rivets I had already set, but other than that it went fine.

The next step is to install the support brackets for the main and rear spars.

It is soooo good to be back on track after the delay with the mis-drilled side skins.
' style=

Gusset between gear channel and front spar box

Gusset between gear channel and front spar box

' style=

Side view of the gusset drilling

Side view of the gusset drilling

' style=

Bottom gusset detail

Bottom gusset detail

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.