KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  5-12-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finished main gear mounting, drilling fuse sides a

Many little tasks today. I finished installing the left gear mount and re-inforcements. Gussets where installed at the top. I then marked and drilled the rear part of the front skin to the upper longeron and also to the rear side skin.

Moving rearward, I joined the front and rear upper longeron with 8 A5 holes (to be riveted) as per the plans.

I pre-drilled the holes in the three turtledeck bulkheads as per the plans as well. They will be backdrilled into the turtledeck skin later in construction.
' style=

Left gear supports in place along with gussets

Left gear supports in place along with gussets

' style=

Front side skin drilled to the upper longeron and down the side of the rear skin

Front side skin drilled to the upper longeron and down the side of the rear skin

' style=

Front and rear upper longeron joined per plans.  Bulkheads drilled for turtledeck skins.

Front and rear upper longeron joined per plans. Bulkheads drilled for turtledeck skins.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.