Started work on the right rear fuselage side. The L angles were cut and drilled in place. The side was then positioned into place and drilled to the fuse bottom and the rear two bulkheads.
L angles in place
Right side clamped to rear bulkheads. Notice the .025 shim
Right side drilled in place to lower angle, bulkheads and L angle