Brief Description: Finished fuse bottom right side started
I reassembled the fuse bottom and riveted everying in place. It took longer than I expected due to the blind nuts on the hatch and the need to rivet things in stages, which meant lots of flipping of the bottom. The last thing in place was the final riveting of the rear two bulkheads.
I started the right rear side by cutting and drilling the L angles.