Powered By Kitlog Pro v2.0
Paul's Zenith 601-XL
Zodiak 601 XL
Preparation
12-10-2006
< Previous Log Entry
Next Log Entry >
Date:
12-10-2006
Number of Hours:
1.00
Manual Reference:
Brief Description:
Completed Worktable
Installed the 3/4" finnish birch top on the worktable, leveled it (garage slopes 1/2" over 8 ft!), and stained the top. It is done except for a quick clear coat.
Top stained, but not sealed. Still drying
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
R-80 Tiger Moth Home
Zodiak 601 XL Home
Category
# Logs
# Hours
All
171
552
Ailerons
6
13
Elevator
7
19
Engine
2
2
Flaps
3
8
Fuselage
64
235
Miscellaneous
19
69
Preparation
14
27
Rudder
4
8
Stabilizer
11
22
Wings
41
149
Copyright © 2001-2024 Matronics. All Rights Reserved.