Installed rudder cables and bulkhead bushing per plans. Installed rudder pedal assembling onto angle brackets and tightened bolts Drilled holes for idler brackt on aft side of gear tower angle brackets and installed idler brackets. Installed fittings and high pressure tubing to brake cylinders and installed brake cylinders to rudder pedals Installed idler arms and forward and aft rudder cables to rudder assembly. Tighteneed all bolts and installed cotterpins