KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  5-17-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Horizantal Stab

Made sure all was level and sqaure and drilled #30 holes into HS Rear Spar through the holes in Horizantal stab bars. Clecoed all four as I drilled.
Measured the outboard/aft edge of HS to the first rivet hole in fuselage and squared HS to fuselage.
Was able to drill the two most outboard holes in HS814 and *19 deack and spacers and clecoed but will need an angle drill to get to the inboard holes to maintain a square 90 degree hole.
' style=

Aft Stab bars to HS Rear Spar

Aft Stab bars to HS Rear Spar

' style=




' style=

Within a 1/32 of each other

Within a 1/32 of each other

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.