KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  10-22-2013
Number of Hours:  4.30
Manual Reference:  
Brief Description:  Forward Fuselage Substructure

Fluted F866B and F866A bulkhead flanges. Deburred edges. Separated the F870 stiffners and marked each per plans. Trimmed the two F870D-1 stifffeners. Edged and deburred stiffeners

Edged the F870-1 baggage floor and the F871-1 baggage side.

Clecoed the stiffeners to the baggage floor per plans and final drilled #40 common holes. Unclecoed and final drilled nutplate attach holes in F866 bulkhead and stiffeners.

Clecoed F866D mounting plate and match drilled per plans. Clecoed the upper and lower baggage bulkheads to F802N-1 Upper brace and match drilled common holes. disassembled and deburred all holes

Machine countersinked the three holes in the mounting plate. Dimple countersunk the nutplate holes. Dimple countersunk all the #40 holes in the Baggage Fuselage Substructure.

Primed parts
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.