Date:  10-19-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Landing Gear boxes

Clecoed the landing gear boxes to the forward floor assembly. Clecoed the midcabin braces to the gearbox assembly and marked the hole common with the midcabin braces. Removed the mid cabin braces and riveted the WD822 R/L weldment brackets to the forward and aft F802 bulkheads per plans.

Final drilled all the 1/8 inch common holes between the F802G andH braces. Final drilled to size the large holes in WD813 Wedlment to F822 forward floor assembly. Removed and deburred parts.
Reclecoed parts back to forward floor assembly. Riveted the aft F802H L/R angles on aft side of LG bulhead to F822 forward floor.

Clecoed F802T and F802N braces in place. Matchdriled the 1/8 inch and 3/16 common holes. removed and deburred.

Clecoed the midcabin braces and F864D throttle bracket in place. Matchdrilled, removed and deburred. (I had already edged and primed these parts with the landing gear box batch) Drilled to size the #40 nutplate holes. Countersunk nutplate attach holes in each midcabin braces. Dimpled the F864D Throttle bracket to nutplates.

Started radius on the 8 washers per plans and called it an evening