Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
9-25-2021
< Previous Log Entry
Next Log Entry >
Date:
9-25-2021
Number of Hours:
2.50
Manual Reference:
6-W-5
Brief Description:
Starting L/H wing
FINALLY! starting the L/H wing
spent the last few months remodeling the bathroom in our house and enjoying the summer at the lake fishing.
Pulled all the L/H wing parts out of the attic storage
clamped and drilled spar tip to spar
clamped all doublers to rear spar. Drilled and cleco'd together
lay out of all L/H wing pieces
Drilling L/H spar tip
Drilling L/H wing aft spar
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.