Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
12-27-2020
< Previous Log Entry
Next Log Entry >
Date:
12-27-2020
Number of Hours:
3.00
Manual Reference:
Brief Description:
fuel tank ground / sender wires
made a ground point on nose rib # 3. blue tape is holding an edge grommet on the lightning hole to protect the sender signal wire.
I used the nylon sleeving to protect the wires as the go around the edge of the tank
still waiting on the proseal to dry
ground point for fuel tank
sender ground wire attached
sender signal wire and sleeving
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.