Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
3-23-2020
< Previous Log Entry
Next Log Entry >
Date:
3-23-2020
Number of Hours:
1.50
Manual Reference:
6W6-11
Brief Description:
Starting wings, Aileron Belcrank Support
Finally, got started on the wings.
pulled all the parts from the list/drawing.
Layed out the drill and trim lines for the bell crank supports.
clamped together so they could be held together in drill press vise.
drilling together ensures the pivot hole is square and true.
Getting everything ready on R Wing
Bellcrank support lay-out
Clamped for drilling
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.