KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  6-12-2009
Number of Hours:  0.75
Manual Reference:  12-2, 12-3
Brief Description:  HS, VS Fairings

Filled the surfaces of the fairings with epoxy/microlight filler. The stuff was a little too thin and ran, but nothing sandpaper won't deal with.

Picture: DSC03782
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.