KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
Work Logs Found: 14
Category Work Time: 34 Hours
 Date
Hours
Work Log Summary

Details

 04-15-2019
1.50
Fuel System Work
Details
       

 04-14-2019
4.50
Control Stick Mounting
Details
       

 04-13-2019
2.00
Control System, Aux Fuel
Details

 03-20-2019
1.50
Controls, Fuel Line
Details

 02-10-2019
7.00
Multiple jobs, put together elev. pushrod
Details
       

 02-06-2019
1.50
Control pushrod install
Details
       

 02-04-2019
1.75
Elevator pushtube install
Details

 12-20-2018
2.00
Control system and flap torque tube assembly
Details
       

 12-19-2018
2.00
Control system assembly
Details
       

 12-17-2018
2.50
Priming of control system parts
Details
       

 12-12-2018
1.50
Control stick base
Details

 12-07-2018
2.25
Elevator idler arm and control sticks
Details
       

 12-05-2018
2.25
Elevator pushrods
Details
       

 11-28-2018
1.50
Elevator push tubes
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.