KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  5-31-2009
Number of Hours:  1.50
Manual Reference:  12-2, 12-3
Brief Description:  HS, VS Fairings

Fabricated the aft surfaces of the fairings. To do this, I first made a layup of a single layer of BID glass and let it cure on a perfectly flat surface. This creates a flexible piece that will conform to the shape created on the HS fairings. I cut some spacers so the fairings were in the proper position while I attached the aft surface and laid in a bead of epoxy/cabosil. I then attached to the HS and VS so that while curing the shape would be right.

Pictures: DSC03775 - DSC03781
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.