KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  5-13-2009
Number of Hours:  3.25
Manual Reference:  12-2, 12-3
Brief Description:  Elevator Fairings

Finished up the right elevator tip fairing. Like the left, some glass work will be required but overall very good. I did take a little too much material to allow for the trailing edge wedge and left a gap, but that will be easy to fill.

Pictures: DSC03769 - DSC03770
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.