KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  4-25-2008
Number of Hours:  1.25
Manual Reference:  10-4-4 to 10-4-5
Brief Description:  Tailcone Bulkheads

Finished deburring the F-1007 frames. Clecoed and final drilled. Final drilled the 5/8" holes in the frames.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.