KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  1-30-2008
Number of Hours:  1.00
Manual Reference:  9-15-4 to 9-15-5
Brief Description:  Elevator Assembly

Finished rolling the leading edge on the other elevator, and drilled the holes.

Pictures: DSC03602 - DSC03603
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.