KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  1-28-2008
Number of Hours:  2.00
Manual Reference:  9-14-12 to 9-15-2
Brief Description:  Elevator Assembly

Riveted the trailing edge of the elevators. They came out great using the method I tried on the rudder. I squeeze the rivets first, partially setting them. I do every tenth rivet, then go back and set the rivet adjacent to these, and continue doing this until they are all squeezed. I make sure the squeezer is flush on the manufactured side, then set the depth so the other die doesn't touch the skin on the other side. Once this is done, I flip the elevator over and back rivet flush using the flush rivet set. I do every tenth rivet again to make sure there is no bend in the edge.

Finished riveting the skins to the tip ribs, and the shear clips to the close outs.

Pictures: DSC03596 - DSC03599
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.