KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  12-22-2007
Number of Hours:  2.00
Manual Reference:  9-7-3 to 9-7-7
Brief Description:  Elevator Drilling

Finished match drilling the elevator skins to the skeleton. Drilled the holes for the trim cable anchor brackets in the cover plates. Dimpled the holes in the cover plate. Disassembled everything for deburring, surface prep and dimpling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.