KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  11-10-2007
Number of Hours:  2.25
Manual Reference:  8-9-9
Brief Description:  Priming

Got all the parts primed. This was my largest batch of priming yet, and I was able to get everything done on one sprayer cup-full of primer. I have gotten better at controlling the flow on the sprayer and adjust it depending on the size of the part I'm spraying. This really helps conserve primer and I end up with very little on other parts of the shop.

Pictures: DSC03526 - DSC03530
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.