KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  9-29-2007
Number of Hours:  2.50
Manual Reference:  8-5-8
Brief Description:  HS Front Spar Priming

Got to try out my new tool for priming surface prep. It's the Taylor pneumatic DA sander with the 5" velcro attachment for holding scotchbrite pads. It does a fantastic job on larger pieces, but on small pieces or inside the curved flange of the spar the scotchbrite tends to fly off. Taylor makes a 2" version (that costs twice as much-go figure) that I may pick up for smaller parts.

Got all the parts primed after surface prep/cleaning.

Pictures: DSC03509 - DSC03510
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.