KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  6-10-2007
Number of Hours:  1.00
Manual Reference:  6-4-1 to 6-4-3
Brief Description:  Vertical Stabilizer Spars

Match drilled the VS front spar doubler and deburred. Dimpled the appropriate holes in the spar and countersunk corresponding holes in doubler. Separated the rudder stops and deburred the edges.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.