KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  9-11-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Battery Cable

Setting up the primary power on the engine side of the firewall. These lines may be somewhat larger than needed but I have the material available and there will be less voltage drop using the heavier line.

Pic: IMG_0210.jpg
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.