Kents RV-10 Construction Site
' style=
Date:  12-17-2018
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Priming of control system parts

Primed the elevator parts and the some of the bare metal on the torque tubes (but not where they ride in the bushings). I actually riveted the threaded rod ends on while the primer was still wet as they are a very tight fit and I ended up sanding off the primer to get them to fit when I made push tubes in the past.

Pics: IMG_1868 - IMG_1869.jpg