KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  12-13-2018
Number of Hours:  1.50
Manual Reference:  40-2-1:40-3-1
Brief Description:  Flap torque tube drilling

Assembly of flap torque tube parts and drilling. I just used my bench as a reference surface which seemed to work well as the two sides came out almost identically when I installed the parts.

Pic: IMG_1865.jpg
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.