KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  11-19-2018
Number of Hours:  2.00
Manual Reference:  35-4-6, 34-4-8:9
Brief Description:  Baggage door final assembly

Installed nutplates for the side cover. Also installed the lock on the baggage door and finished riveting the inside panel to the baggage door.

Pics: IMG_1838 - IMG_1840.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.