KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  10-13-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Tailcone wiring

Now that the tailcone is attached the wiring runs can be put in place. The connector from SteinAir needed to be de-pinned so that it could be run through the conduit. The wires are not all labeled but the ones that would otherwise be ambiguous are labeled so there's no worry about putting everything back where it came from.

PIcs: IMG_1027 - IMG_1028.jpg
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.